![]() ![]() Also, the keynote schedules no longer respected the "filter by sheet" setting nor the sheet width setting. Creating new views revealed the walls were still in the model (plan, 3D, etc.). In the eTransmitted model, the walls disappeared from the plan, elevation, and section views (but not the RCP views). (The purpose of this exercise was to prepare the model for transmission to the GC's sub-contractors) except they didn't exactly cleanup as I expected. I ran eTransmit today using some of the "Project Cleanup" tools.
0 Comments
Leave a Reply. |